A late or rejected PPAP can hold an entire launch hostage. We manage the PPAP and APQP process with your suppliers — control plans, PFMEAs, PSW packages, and submission levels — so parts get approved on time and launches stay on track.
Product launches live or die on supplier readiness. When a supplier's PPAP submission is incomplete, late, or rejected, the whole program slips — and the cost of a delayed launch dwarfs the cost of managing the process correctly the first time.
We provide hands-on PPAP and APQP support for manufacturers and their suppliers, drawing on decades of launching new products and qualifying suppliers across automotive, aerospace, and heavy machinery. From APQP planning through PSW sign-off, we keep the documentation right and the timeline intact.
Coordinate and review complete PPAP packages at the required submission level — from Level 1 through full Level 3 documentation.
Drive APQP through all phases with clear milestones and gate reviews so launch risks surface early, not at production.
Develop and review control plans and PFMEAs that reflect real process risk — the backbone of a defensible PPAP.
Verify Part Submission Warrants, dimensional results, MSA, and capability studies are complete and correct before submission.
Work directly with suppliers to close documentation gaps and keep their submissions aligned to your launch timeline.
Confirm suppliers can actually produce at required rate and capacity before you commit to launch.
Map submission levels, milestones, and gate reviews to your launch date so nothing surprises you late.
Develop control plans, PFMEAs, and the PPAP elements alongside your suppliers.
Review PSW, dimensional, MSA, and capability data for completeness before submission to avoid rejections.
Validate real production capability and capacity so launch commitments are backed by evidence.
All levels, from Level 1 (PSW only) through Level 3 full documentation and beyond. We determine the appropriate level with you based on customer requirements and part risk.
Yes. We coordinate directly with your suppliers to build and close out PPAP documentation and keep their submissions aligned to your launch timeline.
Yes. We frequently step into at-risk launches to close documentation gaps, resolve rejected submissions, and confirm run-at-rate. Contact us at [email protected] for urgent support.
Automotive (AIAG PPAP/APQP), aerospace, defense, and heavy machinery. Our experience spans OEM and Tier 1 launches across all of these sectors.
Support is quoted per program or per supplier based on part complexity, submission level, and the number of suppliers involved — from managing a single critical PPAP to running APQP across an entire launch. Request a quote and we will scope it to your program timeline.
Explore quality systems at QMSLeanPrefer email? Reach us directly at [email protected]
Tell us about your supplier quality needs and we\'ll respond with a scoped proposal.